TABLE
OF CONTENTS
7. ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE
8. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure
1 Project General
Layout
Figure
2 Air and Noise Monitoring
Locations
LIST OF
APPENDICES
Weather
and Meteorological Conditions during Reporting Month |
|
|
|
i.
The
Civil Engineering and Development Department HKSAR has appointed MateriaLab Consultants Limited (MCL) to undertake the Environmental
Team services for the Project and implement the EM&A works.
ii.
This
Monthly EM&A report presents the environmental monitoring and audit works
for the period between 1 May 2018 and 31 May 2018. As informed by the
Contractor, major activities in the reporting month were:
Excavation
and laying of drainage pipe and manhole;
Seawall
modification works;
Construction
of tunnel box structure;
D-wall
construction works;
Pumping
test; and
Excavation
and ELS construction.
Breaches of the Action and Limit Levels
iii. No Action / Limit Level exceedance was recorded
for 24-hr TSP and construction noise at KTD1a, KTD2a and KER1b in the reporting
month.
Complaint,
Notification of Summons and Successful Prosecution
iv.
A complaint received
on 30 May 2018 referred from EPD regarding some large stockpiles were found
uncovered and dust emission was observed during excavation (the site between
Kai Fuk Road and Shing Cheong Road, Southwest of
Kowloon Bay International Trade & Exhibition Center).
The notification of complaint was received
by ET on 8 June 2018.
v.
No notification of
summons and successful prosecution were received in the reporting month.
Reporting Changes
vi. There was no reporting change in the
reporting month.
Future Key Issues
vii. The key issues to be considered in the
coming reporting month include:
Potential
environmental impacts arising from the above construction activities are mainly
associated with construction dust, construction noise, water quality, waste
management and landscape and visual impact.